The Old Grammar School in Market Harborough is considered by many to be the town’s most iconic building. Originally constructed in 1614 and set on distinctive wooden ‘legs’, the grade one listed building is now used as a community meeting place. The building is administered by Market Harborough & The Bowdens Charity.
Although looking acceptable from the outside, the charity was concerned that the building was slowly falling into disrepair. The charity was determined to return the building to its former glory, and so commissioned WW Brown and Sons to co-ordinate and carry out the first major restoration of the building in a generation.
The restoration, which was funded by the charity and by public donations, began in March and concluded on schedule at the end of October 2014. The aim was to restore the exterior of the building to look much as it would have done when it was first built. This meant looking again at the wood used, the timber treatments and the pigmentation of the paints used.
Project manager Mark Brown of WW Brown & Sons explains.
Despite what many people think, the building originally looked a little different. The timber cladding above the legs which gives the exterior its traditional Tudor appearance didn’t actually exist when the school was built. In fact, it was a completely rendered building. Whilst the renovation is now in keeping with the original building, it was decided to keep and renovate the oak cladding as it is such an attractive and recognisable feature of the building’s exterior. The new oak woodwork will also be long lasting and more resistant to a variety of weather conditions.
WW Brown have removed the concrete render which was added in the 1860s and replaced it with breathable lime mortar as was used in the original construction. The original oak window frames are also being reformed and reglazed to resemble their original form. The Victorian glass has been removed, and the new glass will include triangular leaded lights instead of plain square glass. Works to the bell turret have included re-hanging the bronze bell, which dated back to 1808.
Finally, the roof has been re-slated with new Welsh slates. In order to involve Market Harborough’s younger generation, the town’s primary schools were invited to contribute to the project by creating their own personalised slates. Mark explained:
The roof has 8 parts to it and there are 7 primary schools in the town meaning that all the schools could take part, leaving one for the charity to create their own images. The idea is that the children’s artwork will become a form of time capsule that could last for a century, creating an interesting legacy for the town.
The project has been an important one for WW Brown. As well as the professional pride of doing an important job on a famous historical building, there is a lot of pride in the Harborough based building company that they have been involved in such a prestigious town project.
-
-
The clock tower
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the roof
-
-
Working on the sides
-
-
Working on the sides
-
-
Scaffolding up
-
-
Top half revealed
-
-
Top half revealed
-
-
Top half revealed
-
-
Top half revealed
-
-
Grammar school covered
-
-
Painting the window frames
-
-
Scaffolding up
-
-
Underneath the school
-
-
Underneath the school
-
-
Putting up the scaffolding
-
-
Putting up the scaffolding
-
-
Replacing the stilts
-
-
Working on the roof
-
-
School under construction
-
-
Working on the new stilt
-
-
Putting new stilts into place
-
-
School covered up
-
-
Schools new look being filmed
-
-
Scaffolding on the roof
-
-
working on the refurbishment
-
-
Holding the school in place
-
-
Sides of school after refurbishment
-
-
Sides of school after refurbishment
-
-
Sides of school after refurbishment
-
-
Sides of school after refurbishment
-
-
The repaired windows
-
-
Working on the sides
-
-
Working on the new stilts
-
-
Working on the new stilts
-
-
Working on the new stilts
-
-
Working on the new stilts
-
-
Working on the new stilts
-
-
Putting the new stilt into place
-
-
Putting the new stilt into place
-
-
Working on refurbishment
-
-
Redoing the floor
-
-
Redoing the floor
-
-
Redoing the floor
-
-
Redoing the floor
-
-
Redoing the floor
-
-
Working on the refurbishment
-
-
Working on the sides
-
-
Crack in old flooring
-
-
Working on the sides
-
-
Hole in floor
-
-
Old flooring
-
-
Old flooring
-
-
Clock tower
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the clock tower
-
-
Clock tower
-
-
Working on the sides
-
-
Work underneath the school
-
-
Work underneath the school
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the sides
-
-
-
Working underneath the school
-
-
Work on the clock tower
-
-
Work on the clock tower
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the sides
-
-
Framework of the school
-
-
The bell
-
-
Working on the sides
-
-
Working on the sides
-
-
Framework and the bell
-
-
The bell
-
-
Framework
-
-
Framework
-
-
The bell
-
-
Framework
-
-
The bell
-
-
Framework
-
-
The bell
-
-
The bell
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Framework
-
-
The bell
-
-
Worker on the Grammar school
-
-
Working on the clock tower
-
-
The clock tower
-
-
Working on the clock tower
-
-
Working on the sides
-
-
Work on the refurbishment
-
-
Work on the refurbishment
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the clock tower
-
-
Working on the sides
-
-
Working on the refurbishment
-
-
Working on the refurbishment
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the windows
-
-
Working on the refurbishment
-
-
Working on the top
-
-
Working on the top
-
-
Work on the roof
-
-
Work on the roof
-
-
Working on refurbishment
-
-
Working on refurbishment
-
-
Work on clock tower
-
-
Scaffolding on school
-
-
School refurbishment
-
-
Working on the roof
-
-
Scaffolding
-
-
Working on the top
-
-
Working on inside of roof
-
-
Before damage
-
-
Before damage
-
-
Working on the top
-
-
Framework
-
-
Framework
-
-
Working on the top
-
-
Working on the sides
-
-
Working on the top
-
-
School refurbishment
-
-
The bell
-
-
The bell
-
-
The bell
-
-
The bell
-
-
Framework
-
-
The clock tower
-
-
Putting the scaffolding up
-
-
Working underneath the school
-
-
Damage underneath school
-
-
School unveiled
-
-
School unveiled
-
-
School unveiled
-
-
New stilts
-
-
Working on the roof
-
-
School with scaffolding
-
-
-
Work on the roof
-
-
New school being filmed
-
-
Under construction
-
-
New sides
-
-
New sides
-
-
Stilt replacement
-
-
Restoring the stilits
-
-
Working on new stilts
-
-
Working on new stilts
-
-
New stilt
-
-
New top of school
-
-
New sides
-
-
Work done on windows
-
-
Working on the side top
-
-
Work on the roof
-
-
Putting the new stilt in place
-
-
Putting the new stilt in place
-
-
New floors underway
-
-
New floors underway
-
-
Working on refurbishment
-
-
Work on new stilt
-
-
Work on new stilt
-
-
Working on new stilt
-
-
Work on new stilt
-
-
New floors underway
-
-
New floors underway
-
-
New floors underway
-
-
Working on the sides
-
-
Working on the sides
-
-
Working on the sides
-
-
Worker on the school
-
-
Work on sides
-
-
Work on sides
-
-
Clock tower and roof
-
-
Clock tower
-
-
Working on the side
-
-
Clock tower
-
-
Work on sides
-
-
Work on sides
-
-
Work on sides
-
-
Work on sides
-
-
Working on refurbishment
-
-
Working on refurbishment
-
-
Working on clock tower
-
-
Working on clock tower
-
-
School uncovered